Posted by: Chester in Untagged on
Nov 15, 2007
11/15/07
This is the first entry in the construction log,
Ange de Mer began on September 10th. We began with moving the two existing palm trees out of the construction line and set Helical Piers - essentially 2 ½" steel tubing with split 10" plates welded onto them. They were augured into the ground to a depth of about